Better Estimation of PERT Activity Time Parameters
From MaRDI portal
Publication:4282282
DOI10.1287/mnsc.39.9.1086zbMath0800.90575OpenAlexW2085757315MaRDI QIDQ4282282
Donald L. Keefer, William A. Verdini
Publication date: 14 March 1994
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.39.9.1086
Related Items
The generalized two-sided power distribution, An alternative for robust estimation in project management, On ANOVA expansions and strategies for choosing the anchor point, Reexamining Discrete Approximations to Continuous Distributions, The generalized two-sided beta distribution with applications in project risk analysis, Optimal keyword bids in search-based advertising with stochastic advertisement positions, Estimating Uncertainties Using Judgmental Forecasts with Expert Heterogeneity, Mixture densities for project management activity times: A robust approach to PERT, Managing projects with uncertain deadlines, An approximation of the activity duration distribution in PERT., A link between two-sided power and asymmetric Laplace distributions: with applications to mean and variance approximations, Distribution of the Activity Time in Network Analysis: A Critical Revisit with a Gamma Alternative, The model identification of beta distribution based on quantiles, Critical path in an activity network with time constraints, Finding the critical path in an activity network with time-switch constraints, A comparison of procedures for estimating the parent probability distribution from a given set of fractiles, The effects of reducing demand uncertainty in a manufacturer-retailer channel for single-period products