Batching and Scheduling in FMS Hubs: Flow Time Considerations
From MaRDI portal
Publication:4285166
DOI10.1287/opre.41.6.1091zbMath0800.90549OpenAlexW2051062506MaRDI QIDQ4285166
Daniel E. Lane, Jeffrey B. Sidney
Publication date: 13 March 1994
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.41.6.1091
Related Items (5)
Minimizing total weighted tardiness on a single batch process machine with incompatible job families ⋮ Heuristic algorithms for two machine re-entrant flow shop ⋮ Coordination in a two-stage production system: complexity, conflict and cooperation ⋮ Sequencing jobs for an automated manufacturing module with buffer ⋮ A new dynamic look-ahead scheduling procedure for batching machines
This page was built for publication: Batching and Scheduling in FMS Hubs: Flow Time Considerations