Optimizing the allocation of components to kits in small-lot, multiechelon assembly systems
From MaRDI portal
Publication:4286309
DOI10.1002/1520-6750(199403)41:2%3C229::AID-NAV3220410208%3E3.0.CO;2-HzbMATH Open0798.90075OpenAlexW2034526156MaRDI QIDQ4286309
No author found.
Publication date: 27 March 1994
Full work available at URL: https://doi.org/10.1002/1520-6750(199403)41:2%3C229::aid-nav3220410208%3E3.0.co;2-h
Cites Work
Related Items (4)
Allocation of Chips to Wafers in a Production Problem of Semiconductor Kits โฎ Optimal Assignment of Components to a Two-Stage k-Out-of-n System โฎ On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems โฎ Allocation of tasks to stations in small-batch assembly with learning: basic concepts
Recommendations
- Unnamed Item ๐ ๐
- An optimal lot-sizing model for multi-stage series/assembly systems ๐ ๐
- Asymptotically-optimal component allocation for assemble-to-order production-inventory systems ๐ ๐
- Component allocation in make-to-stock assembly systems ๐ ๐
- Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources ๐ ๐
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems ๐ ๐
- Optimization of Industrial-Scale Assemble-to-Order Systems ๐ ๐
- Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems ๐ ๐
- Combining items for lot sizing in multi-level assembly systems ๐ ๐
- Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources ๐ ๐
This page was built for publication: Optimizing the allocation of components to kits in small-lot, multiechelon assembly systems