The Most Critical Path in a PERT Network
From MaRDI portal
Publication:4287635
DOI10.1057/jors.1994.42zbMath0797.90024OpenAlexW2042891879MaRDI QIDQ4287635
Publication date: 12 April 1994
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1994.42
Related Items (5)
Longest path analysis in networks of queues: dynamic scheduling problems ⋮ Resource-constrained project scheduling: Notation, classification, models, and methods ⋮ Evaluating project completion time in project networks with discrete random activity durations ⋮ Critical path in an activity network with time constraints ⋮ Finding the critical path in an activity network with time-switch constraints
This page was built for publication: The Most Critical Path in a PERT Network