Multi-Item Single-Machine Scheduling with Material Supply Constraints
From MaRDI portal
Publication:4287652
DOI10.1057/jors.1993.186zbMath0801.90063OpenAlexW1979437523MaRDI QIDQ4287652
Zhong K. Xiong, André Gascon, Robert C. Leachman
Publication date: 12 April 1994
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1993.186
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Dynamic programming (90C39)
Related Items (max. 100)
Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company ⋮ Lot sizing and scheduling -- survey and extensions
This page was built for publication: Multi-Item Single-Machine Scheduling with Material Supply Constraints