Supply management in assembly systems
From MaRDI portal
Publication:4287984
DOI<link itemprop=identifier href="https://doi.org/10.1002/1520-6750(199312)40:7<933::AID-NAV3220400706>3.0.CO;2-8" /><933::AID-NAV3220400706>3.0.CO;2-8 10.1002/1520-6750(199312)40:7<933::AID-NAV3220400706>3.0.CO;2-8zbMath0801.90051OpenAlexW2081771088WikidataQ57186065 ScholiaQ57186065MaRDI QIDQ4287984
Chengbin Chu, Xiaolan Xie, Jean Marie Proth
Publication date: 19 April 1994
Full work available at URL: https://doi.org/10.1002/1520-6750(199312)40:7<933::aid-nav3220400706>3.0.co;2-8
Related Items (8)
A note on the first moment of makespan in an assembly shop ⋮ Safety times for multistage assembly system ⋮ Optimal supply planning in MRP environments for assembly systems with random component procurement times ⋮ Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times ⋮ Multilevel production systems with dependent demand with uncertainty of lead times ⋮ Generalized newsboy model to compute the optimal planned lead times in assembly systems ⋮ Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm ⋮ Input control in a batch production system with lead times, due dates and random yields
This page was built for publication: Supply management in assembly systems