Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Necessary optimality conditions for a generalized problem of production scheduling

From MaRDI portal
Publication:4306903
Jump to:navigation, search

DOI10.1002/oca.4660150306zbMath0821.90060OpenAlexW2164845352MaRDI QIDQ4306903

Eugene Khmelnitsky, Konstantin Kogan

Publication date: 22 September 1994

Published in: Optimal Control Applications and Methods (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1002/oca.4660150306


zbMATH Keywords

maximum principlenecessary optimality conditionsproduction schedulingflexible flow shopcontinuous-time optimal controlirregular constraints


Mathematics Subject Classification ID

Production models (90B30) Application models in control theory (93C95)


Related Items

A maximum principle based combined method for scheduling in a flexible manufacturing system ⋮ Optimal control of assembling complexes under predetermined maintenance conditions ⋮ An optimal control model for continuous time production and setup scheduling ⋮ Optimal policies for aggregate production and capacity planning under rapidly changing demand conditions



Cites Work

  • Optimization and nonsmooth analysis
  • Unnamed Item
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4306903&oldid=18246526"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 6 February 2024, at 20:50.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki