Stochastic procedures for scheduling minimum job sets on mixed model assembly lines
From MaRDI portal
Publication:4347414
DOI10.1057/palgrave.jors.2600391zbMath0882.90065OpenAlexW2012740425MaRDI QIDQ4347414
Publication date: 10 March 1998
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2600391
heuristicssimulated annealingsequencinglower boundsstochastic algorithmsmixed model assembly linepaced line
Related Items
A scatter search based hyper-heuristic for sequencing a mixed-model assembly line ⋮ Solving the car sequencing problem via branch \& bound ⋮ Sequencing mixed-model assembly lines to minimize part inventory cost ⋮ Sequencing mixed-model assembly lines: survey, classification and model critique