Optimal control of a production system with periodic maintenance
From MaRDI portal
Publication:4349145
DOI<link itemprop=identifier href="https://doi.org/10.1002/(SICI)1099-1514(199610/12)17:4<281::AID-OCA577>3.0.CO;2-8" /><281::AID-OCA577>3.0.CO;2-8 10.1002/(SICI)1099-1514(199610/12)17:4<281::AID-OCA577>3.0.CO;2-8zbMath0874.90099OpenAlexW2056996955MaRDI QIDQ4349145
Franz-Josef Krämer, Sherman X. Bai
Publication date: 8 September 1997
Full work available at URL: https://doi.org/10.1002/(sici)1099-1514(199610/12)17:4<281::aid-oca577>3.0.co;2-8
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30) Application models in control theory (93C95)
Related Items (4)
Analysis and control of a single-item production–inventory system with shortages and back orders ⋮ An optimal production flow control problem with impulsive demand ⋮ New search algorithm for solving the maintenance scheduling problem for a family of machines ⋮ Multiperiod production planning with demand and cost fluctuation
This page was built for publication: Optimal control of a production system with periodic maintenance