An algorithm to minimize total flowtime and maximum job lateness in the two-machine flowshop system
From MaRDI portal
Publication:4354087
DOI10.1080/02522667.1997.10699309zbMath0886.90087OpenAlexW2032886681MaRDI QIDQ4354087
Farhad M. E. Raiszadeh, Tapan Sen
Publication date: 23 April 1998
Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/02522667.1997.10699309
Related Items (1)
Cites Work
This page was built for publication: An algorithm to minimize total flowtime and maximum job lateness in the two-machine flowshop system