Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence
From MaRDI portal
Publication:435728
DOI10.1016/j.disopt.2011.11.001zbMath1242.90077OpenAlexW1996135521MaRDI QIDQ435728
Mikhail Y. Kovalyov, Bertrand M. T. Lin, Feng-Jang Hwang
Publication date: 12 July 2012
Published in: Discrete Optimization (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.disopt.2011.11.001
Related Items (4)
Relocation scheduling subject to fixed processing sequences ⋮ Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence ⋮ Scheduling with centralized and decentralized batching policies in concurrent open shops ⋮ Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence
Cites Work
- Unnamed Item
- Batching decisions for assembly production systems
- An improved earliness--tardiness timing algorithm
- Batching and scheduling in a multi-machine flow shop
- A concise survey of scheduling with time-dependent processing times
- An algorithm for insertion of idle time in the single-machine scheduling problem with convex cost functions
- Optimal timing of a sequence of tasks with general completion costs
- Scheduling with batching: A review
- Minimizing the earliness--tardiness costs on a single machine
- Scheduling Batches with Sequential Job Processing for Two-Machine Flow and Open Shops
- Scheduling with centralized and decentralized batching policies in concurrent open shops
- One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties
- The open shop scheduling problem with a given sequence of jobs on one machine
- Single-machine scheduling with early and tardy completion costs
- Optimal timing schedules in earliness-tardiness single machine sequencing
- Two‐machine flowshop scheduling with conditional deteriorating second operations
This page was built for publication: Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence