Bicriterion scheduling in the two-machine flowshop
From MaRDI portal
Publication:4359925
DOI10.1057/palgrave.jors.2600442zbMath0892.90106OpenAlexW2015424186MaRDI QIDQ4359925
No author found.
Publication date: 20 October 1997
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/palgrave.jors.2600442
makespantwo-machine flowshoptotal tardinessnumber of tardy jobsbicriterion schedulingtwo-machine case
Related Items (7)
Solving multi-objective production scheduling problems using metaheuristics ⋮ An improved particle swarm optimization with decline disturbance index (DDPSO) for multi-objective job-shop scheduling problem ⋮ Pareto optima for total weighted completion time and maximum lateness on a single machine ⋮ Multicriteria scheduling problems: a survey ⋮ Counting and enumeration complexity with application to multicriteria scheduling ⋮ Multicriteria scheduling ⋮ Genetic local search for multi-objective flowshop scheduling problems
This page was built for publication: Bicriterion scheduling in the two-machine flowshop