Scheduling Parallel Manufacturing Cells with Resource Flexibility
From MaRDI portal
Publication:4363675
DOI10.1287/mnsc.42.9.1260zbMath0880.90060OpenAlexW2142874101MaRDI QIDQ4363675
Barbara J. Hoopes, Joseph B. Mazzola, Richard L. Daniels
Publication date: 12 November 1997
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.42.9.1260
Related Items (13)
Scheduling identical parallel machines and operators within a period based changing mode ⋮ Scheduling with flexible resources in parallel workcenters to minimize maximum completion time ⋮ Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs ⋮ A performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignment ⋮ Minimizing the makespan on two identical parallel machines with mold constraints ⋮ Minimizing the number of late jobs for the permutation flowshop problem with secondary resources ⋮ Process flexibility: design, evaluation, and applications ⋮ Impact of worker and shop flexibility on assembly cells ⋮ Scheduling of unrelated parallel manufacturing cells with limited human resources ⋮ Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound ⋮ A new bounding mechanism for the CNC machine scheduling problems with controllable processing times ⋮ Production, maintenance and resource scheduling: a review ⋮ Parallel machine scheduling with additional resources: notation, classification, models and solution methods
This page was built for publication: Scheduling Parallel Manufacturing Cells with Resource Flexibility