Workforce Planning in Mixed Model Assembly Systems
From MaRDI portal
Publication:4363757
DOI10.1287/opre.45.4.553zbMath0887.90081OpenAlexW2165867385MaRDI QIDQ4363757
Chung-Yee Lee, George L. Vairaktarakis
Publication date: 12 November 1997
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.45.4.553
Related Items (11)
Decomposition methods for cost and tardiness reduction in aircraft manufacturing flow lines ⋮ Assigning cross-trained workers to departments: a two-stage optimization model to maximize utility and skill improvement ⋮ Complexity analysis of balloon drawing for rooted trees ⋮ Minimizing the total waiting time of intermediate products in a manufacturing process ⋮ Optimal workforce assignment to operations of a paced assembly line ⋮ Optimal workforce size and allocation for urban retail chains ⋮ Minimizing the number of workers in a paced mixed-model assembly line ⋮ Temporary workforce planning with firm contracts: a model and a simulated annealing heuristic ⋮ Workface planning in synchronous production systems ⋮ Cyclic job scheduling in paced assembly lines with cross-trained workers ⋮ SimMan -- A simulation model for workforce capacity planning
This page was built for publication: Workforce Planning in Mixed Model Assembly Systems