Stochastic scheduling for a two-machine open shop
From MaRDI portal
Publication:4364879
DOI10.2307/3215098zbMATH Open0891.90085OpenAlexW2325608155MaRDI QIDQ4364879
Publication date: 12 July 1998
Published in: Journal of Applied Probability (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.2307/3215098
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Related Items (3)
Four decades of research on the open-shop scheduling problem to minimize the makespan โฎ Minimizing the Makespan and Flowtime in Two-Machine Stochastic Open Shops โฎ Unnamed Item
Recommendations
- Unnamed Item ๐ ๐
- Unnamed Item ๐ ๐
- Unnamed Item ๐ ๐
- Two machine openshop scheduling with machine-dependent processing times ๐ ๐
- Two-stage open shop scheduling with a bottleneck machine ๐ ๐
- Scheduling the two-machine open shop problem under resource constraints for setting the jobs ๐ ๐
- Minimizing the Makespan and Flowtime in Two-Machine Stochastic Open Shops ๐ ๐
- Two-machine open shop scheduling with an availability constraint ๐ ๐
This page was built for publication: Stochastic scheduling for a two-machine open shop