Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Two-machine flowshop scheduling to minimize the number of tardy jobs

From MaRDI portal
Publication:4367035
Jump to:navigation, search

DOI10.1057/palgrave.jors.2600346zbMath0888.90090OpenAlexW2037094092MaRDI QIDQ4367035

Jatinder N. D. Gupta, A. M. A. Hariri

Publication date: 25 November 1997

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/palgrave.jors.2600346


zbMATH Keywords

heuristictwo-machine flowshoppolynomially solvable special casestotal number of tardy jobs


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (6)

Minimizing the weighted number of tardy jobs on multiple machines: a review ⋮ A branch and bound algorithm to minimize the total weighed number of tardy jobs and delivery costs ⋮ An \(O(n^{2})\) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines ⋮ Algorithms for a two‐machine flowshop problem with jobs of two classes ⋮ Minimizing the weighted number of tardy jobs on a two-machine flow shop. ⋮ Minimizing tardy jobs in a flowshop with common due date




This page was built for publication: Two-machine flowshop scheduling to minimize the number of tardy jobs

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4367035&oldid=18354036"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 6 February 2024, at 23:30.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki