Control charts for time series
From MaRDI portal
Publication:4378947
DOI10.1016/S0362-546X(97)00278-2zbMath1127.62434MaRDI QIDQ4378947
Wolfgang Schmid, Holger Kramer
Publication date: 1997
Published in: Nonlinear Analysis: Theory, Methods & Applications (Search for Journal in Brave)
Time series, auto-correlation, regression, etc. in statistics (GARCH) (62M10) Applications of statistics in engineering and industry; control charts (62P30)
Related Items (2)
Robust residual control chart for contaminated time series: A solution to the effects of outlier-driven parameter misestimation on the control chart performance ⋮ SPC for short-run multivariate autocorrelated processes
Cites Work
- The multivariate normal distribution
- Time series: theory and methods.
- CUSUM control schemes for Gaussian processes
- The influence of parameter estimation on the ARL of Shewhart type charts for time series
- On the run length of a Shewhart chart for correlated data
- A Simple Method for Studying Run-Length Distributions of Exponentially Weighted Moving Average Charts
- Run-Length Distributions of Special-Cause Control Charts for Correlated Processes
- An approach to the probability distribution of cusum run length
- CONTINUOUS INSPECTION SCHEMES
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: Control charts for time series