Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Cost/time trade-off analysis for the critical path method: a derivation of the network flow approach

From MaRDI portal
Publication:4383676
Jump to:navigation, search

DOI10.1057/PALGRAVE.JORS.2600489zbMath0895.90111OpenAlexW2051478227MaRDI QIDQ4383676

No author found.

Publication date: 2 April 1998

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/palgrave.jors.2600489


zbMATH Keywords

project managementcritical path analysisminimum cost network flowminimum capacity cut-set


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Deterministic network models in operations research (90B10)


Related Items (1)

A heuristic procedure for solving the dynamic probabilistic project expediting problem







This page was built for publication: Cost/time trade-off analysis for the critical path method: a derivation of the network flow approach

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:4383676&oldid=18389162"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 7 February 2024, at 00:41.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki