Minimizing total completion time in two-processor task systems with prespecified processor allocations
DOI<link itemprop=identifier href="https://doi.org/10.1002/(SICI)1520-6750(199803)45:2<231::AID-NAV7>3.0.CO;2-9" /><231::AID-NAV7>3.0.CO;2-9 10.1002/(SICI)1520-6750(199803)45:2<231::AID-NAV7>3.0.CO;2-9zbMath0914.90158OpenAlexW2050331342MaRDI QIDQ4390599
Chung-Yee Lee, Chung-Lun Li, Xiaoqiang Cai
Publication date: 27 June 1999
Full work available at URL: https://doi.org/10.1002/(sici)1520-6750(199803)45:2<231::aid-nav7>3.0.co;2-9
heuristicworst-case analysistotal completion timescheduling multiprocessor tasksprespecified processor locationstwo-processor problem
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35)
Related Items (6)
This page was built for publication: Minimizing total completion time in two-processor task systems with prespecified processor allocations