DLSP for two-stage multi-item batch production
From MaRDI portal
Publication:4394231
DOI10.1080/00207549408956968zbMath0901.90127OpenAlexW2049449821MaRDI QIDQ4394231
Wolfgang Brüggemann, Hermann Jahnke
Publication date: 11 June 1998
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://nbn-resolving.org/urn:nbn:de:0070-bipr-13629
Related Items (5)
Simultaneous lotsizing and scheduling problems: a classification and review of models ⋮ Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches ⋮ Modeling industrial lot sizing problems: a review ⋮ Lot sizing and scheduling -- survey and extensions ⋮ Competitive methods for multi-level lot sizing and scheduling: tabu search and randomized regrets
Cites Work
- Multilevel capacitated lotsizing complexity and LP-based heuristics
- The application of the simulated annealing algorithm to the solution of the \(n/m/C_{\max}\) flowshop problem
- A controlled search simulated annealing method for the single machine weighted tardiness problem
- Analysis of relaxations for the multi-item capacitated lot-sizing problem
- Deterministic lotsizing models for production planning
- Multi-level lot-sizing problem: Evaluation of a simulated-annealing heuristic
- Convergence and finite-time behavior of simulated annealing
- Deterministic Production Planning: Algorithms and Complexity
- Job Shop Scheduling by Simulated Annealing
- Unnamed Item
- Unnamed Item
- Unnamed Item
This page was built for publication: DLSP for two-stage multi-item batch production