An approach to production planning and scheduling in cyclically scheduled manufacturing systems
From MaRDI portal
Publication:4394238
DOI10.1080/00207549408956975zbMath0899.90100OpenAlexW2073028956MaRDI QIDQ4394238
John A. Muckstadt, Andrew G. Loerch
Publication date: 11 June 1998
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549408956975
Related Items
Cites Work
- Unnamed Item
- Unnamed Item
- Due-date-based performance measures for queuing models
- Queues with Dynamic Priority Discipline
- Sequencing in an Assembly Line with Blocking to Minimize Cycle Time
- Manufacturing systems with forbidden early order departure
- Due Date Assignment for Production Systems
- Due-Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue
- Cyclic Schedules for Job Shops with Identical Jobs
- Analysis of the Earliest Due Date Scheduling Rule in Queueing Systems
- A Simulation Study of Predictable Due-Dates
- A 98%-Effective Lot-Sizing Rule for a Multi-Product, Multi-Stage Production / Inventory System
- Time Dependent Priority Queues
- Bounds for a Dynamic-Priority Queue
- Waiting‐time distributions for queues with dynamic priorities