Production planning for a multi-item, single-stage kanban system
From MaRDI portal
Publication:4394261
DOI10.1080/00207549408956994zbMath0901.90118OpenAlexW2011987650MaRDI QIDQ4394261
Ronald G. Askin, M. George Mitwasi
Publication date: 26 November 1998
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549408956994
Cites Work
- A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system
- A Mathematical Programming Approach to a Deterministic Kanban System
- Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
This page was built for publication: Production planning for a multi-item, single-stage kanban system