Multiperiod tool and production assignment in flexible manufacturing systems
From MaRDI portal
Publication:4394267
DOI10.1080/00207549408957000zbMath0901.90121OpenAlexW2168470571MaRDI QIDQ4394267
Ronald G. Askin, Sodhi, Manbir S., Suvrajeet Sen
Publication date: 11 June 1998
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549408957000
Related Items
A decomposition approach for an equipment selection and multiple product routing problem incorporating environmental factors, Improved integer linear programming formulations for the job sequencing and tool switching problem, Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm, A review of some issues and identification of some barriers in the implementation of FMS, Capacity allocation problem in flexible manufacturing systems: branch and bound based approaches, Solving the Job Sequencing and Tool Switching Problem as a nonlinear least cost Hamiltonian cycle problem, Bounding approaches for operation assignment and capacity allocation problem in flexible manufacturing systems, Tool magazine arrangement and operations sequencing on CNC machines, Scheduling multi-colour print jobs with sequence-dependent setup times
Uses Software
Cites Work
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches
- Models Arising from a Flexible Manufacturing Machine, Part II: Minimization of the Number of Switching Instants
- A Branch-and-Bound Method for the Fixed Charge Transportation Problem