Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Scheduling disassembly - MaRDI portal

Scheduling disassembly

From MaRDI portal
Publication:4394319

DOI10.1080/00207549408957046zbMath0896.90118OpenAlexW4230532171MaRDI QIDQ4394319

Surendra M. Gupta, K. N. Taleb

Publication date: 11 June 1998

Published in: International Journal of Production Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207549408957046




Related Items (23)

Disassembly EOQ models with price-sensitive demandsCapacitated disassembly scheduling with random demandA Petri Net based approach to determine the disassembly strategy of a productDisassembly line in product recoveryHeuristics for demand-driven disassembly planningHeuristics for solving disassemble-to-order problems with stochastic yieldsStochastic program for disassembly lot-sizing under uncertain component refurbishing lead timesA balancing method and genetic algorithm for disassembly line balancingIntegrated disassembly and reprocessing lot-sizing for multi-level structured products in remanufacturing systemsTowards circular economy in production planning: challenges and opportunitiesA path-relinking approach for a bi-criteria disassembly sequencing problemA collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problemAn Outer Approximation Algorithm for Capacitated Disassembly Scheduling Problem with Parts Commonality and Random DemandCapacitated disassembly scheduling under stochastic yield and demandCyclic lot scheduling with sequence-dependent set-ups: a heuristic for disassembly processesAnalysis of a product recovery systemA framework for identifying differences and similarities in the managerial competencies associated with different modes of product life extensionPetri net approach to disassembly process planning for products with complex AND/OR precedence relationshipsDisassembly scheduling: literature review and future research directionsCombinatorial optimization analysis of the unary NP-complete disassembly line balancing problemDisassembly sequence generation: A Petri net based heuristic approachSimulation Optimization for MRO Systems OperationsQuantitative models for reverse logistics: A review




This page was built for publication: Scheduling disassembly