SMT production scheduling: a generalized transportation approach
From MaRDI portal
Publication:4394360
DOI10.1080/00207549408957070zbMath0902.90078OpenAlexW2131856611MaRDI QIDQ4394360
No author found.
Publication date: 10 December 1998
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549408957070
revised simplex methodcomputer manufacturingsurface mount technologygeneralized transportation model
Production models (90B30) Special problems of linear programming (transportation, multi-index, data envelopment analysis, etc.) (90C08)
Related Items (2)
The optimisation of the single surface mount device placement machine in printed circuit board assembly: a survey ⋮ A genetic algorithm of determining cycle time for printed circuit board assembly lines
Cites Work
- Unnamed Item
- Solution of constrained generalized transportation problems using the pivot and probe algorithm
- An operator theory of parametric programming for the generalized transportation problem: I. Basic theory
- An operator theory of parametric programming for the generalized transportation problem: II Rim, cost and bound operators
- An operator theory of parametric programming for the generalized transportation problem-III-weight operators
- An operator theory of parametric programming for the generalized transportation problem—IV—global operators
- On the Generalized Transportation Problem
- The Generalized Stepping Stone Method for the Machine Loading Model
- The Dual Method for the Generalized Transportation Problem
This page was built for publication: SMT production scheduling: a generalized transportation approach