Optimal scheduling with deadline constraints in tree networks
From MaRDI portal
Publication:4395833
DOI10.1109/9.650021zbMath0897.90097OpenAlexW2121084552MaRDI QIDQ4395833
Anthony Ephremides, Partha Pratim Bhattacharya, Leandros Tassiulas
Publication date: 12 August 1998
Published in: IEEE Transactions on Automatic Control (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1109/9.650021
Communication networks in operations research (90B18) Deterministic scheduling theory in operations research (90B35)
This page was built for publication: Optimal scheduling with deadline constraints in tree networks