Algorithms for large scale shift minimisation personnel task scheduling problems

From MaRDI portal
Publication:439608

DOI10.1016/j.ejor.2011.11.034zbMath1244.90094OpenAlexW1998645747MaRDI QIDQ439608

Davaatseren Baatar, Andreas T. Ernst, Mohan Krishnamoorthy

Publication date: 16 August 2012

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2011.11.034




Related Items (20)

Task assignment with start time-dependent processing times for personnel at check-in countersA study of decision support models for online patient-to-room assignment planningA Triplet-Based Exact Method for the Shift Minimisation Personnel Task Scheduling ProblemWorkforce planning incorporating skills: state of the artA constraint-based approach for the shift design personnel task scheduling problem with equityMinimizing average project team size given multi-skilled workers with heterogeneous skill levelsSolving technician routing and scheduling problem using improved particle swarm optimizationHeuristic decomposition approaches for an integrated task scheduling and personnel rostering problemA two-phase Pareto front method for solving the bi-objective personnel task rescheduling problemA new formulation and an effective matheuristic for the airport gate assignment problemA shift-based model to solve the integrated staff rostering and task assignment problem with real-world requirementsStaff and machine shift scheduling in a German potash mineImproved quantum genetic algorithm in application of scheduling engineering personnelMulti-objective dynamic fuzzy scheduling and its algorithm in product collaborative design considering emergencyFiltering AtMostNValue with difference constraints: application to the shift minimisation personnel task scheduling problemAn exact approach for the personnel task rescheduling problem with task retimingA greedy heuristic for shift minimization personnel task scheduling problemMinimizing shifts for personnel task scheduling problems: a three-phase algorithmA successful three-phase metaheuristic for the shift minimization personal task scheduling problemSolving the general employee scheduling problem



Cites Work


This page was built for publication: Algorithms for large scale shift minimisation personnel task scheduling problems