MRP systems under supply and process uncertainty in an integrated shop floor control environment
From MaRDI portal
Publication:4398902
DOI10.1080/00207549508930144zbMath0914.90137OpenAlexW2057876265MaRDI QIDQ4398902
Louis Brennan, Surendra M. Gupta
Publication date: 1 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549508930144
Related Items (5)
Optimal supply planning in MRP environments for assembly systems with random component procurement times ⋮ Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times ⋮ Tactical supply chain planning under uncertainty with an application in the wind turbines industry ⋮ Generalized newsboy model to compute the optimal planned lead times in assembly systems ⋮ New lot-sizing formulations for less nervous production schedules
Cites Work
This page was built for publication: MRP systems under supply and process uncertainty in an integrated shop floor control environment