Simulation of tool and part flow in FMSs
From MaRDI portal
Publication:4398934
DOI10.1080/00207549508930171zbMath0915.90126OpenAlexW1974455052MaRDI QIDQ4398934
Tullio Tolio, Antonio Grieco, Quirico Semeraro, S. Toma
Publication date: 16 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549508930171
Related Items (3)
Adaptive scheduling and tool flow control in flexible job shops ⋮ The tooling system configuration in a new manufacturing system architecture ⋮ Optimal tooling policy for a tool switching problem of a flexible machine with automatic tool transporter
This page was built for publication: Simulation of tool and part flow in FMSs