Scheduling flexible flow lines with no in-process buffers
From MaRDI portal
Publication:4398979
DOI10.1080/00207549508930214zbMath0916.90156OpenAlexW2027035110MaRDI QIDQ4398979
Publication date: 30 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549508930214
Related Items (11)
Scheduling flexible flow lines with sequence-dependent setup times ⋮ Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis ⋮ Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective ⋮ An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times ⋮ A taxonomy of flexible flow line scheduling procedures ⋮ A tabu search algorithm for the multi-stage parallel machine problem with limited buffer capacities. ⋮ A memetic algorithm for the flexible flow line scheduling problem with processor blocking ⋮ A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers ⋮ Heuristics and metaheuristics for mixed blocking constraints flowshop scheduling problems ⋮ The hybrid flow shop scheduling problem ⋮ Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
Cites Work
- Scheduling algorithms for flexible flowshops: Worst and average case performance
- Branch and bound algorithm for the flow shop with multiple processors
- Scheduling with Deadlines and Loss Functions
- Flowshop sequencing problems with limited buffer storage
- An Adaptable Scheduling Algorithm for Flexible Flow Lines
- Sequencing Two-Machine Flow-Shops with Finite Intermediate Storage
This page was built for publication: Scheduling flexible flow lines with no in-process buffers