A note on the problem of scheduling a flexible manufacturing system for Just-in-time customers
From MaRDI portal
Publication:4399001
DOI10.1080/00207549508930235zbMath0917.90163OpenAlexW1965297702MaRDI QIDQ4399001
No author found.
Publication date: 18 July 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549508930235
Cites Work
- JIT purchasing and setup reduction in an integrated inventory model
- Streamlining material flow in flexible manufacturing systems: a lesson in simplicity
- Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems
- Economic Lot Size Determination in Multi-Stage Assembly Systems
This page was built for publication: A note on the problem of scheduling a flexible manufacturing system for Just-in-time customers