Revisiting the mixed-model multi-level just-in-time scheduling problem
From MaRDI portal
Publication:4399031
DOI10.1080/00207549508904798zbMath0913.90176OpenAlexW2070368338MaRDI QIDQ4399031
John Miltenburg, Gordon Sinnamon
Publication date: 17 May 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549508904798
Related Items (5)
Balancing and sequencing of parallel mixed-model assembly lines ⋮ Balancing and sequencing mixed-model just-in-time \(U\)-lines with multiple objectives ⋮ Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches ⋮ Developing production schedules which balance part usage and smooth production loads for just-in-time production systems ⋮ Sequencing mixed-model assembly lines: survey, classification and model critique
Cites Work
This page was built for publication: Revisiting the mixed-model multi-level just-in-time scheduling problem