A heuristic for setting up a flexible assembly system
From MaRDI portal
Publication:4399052
DOI10.1080/00207549508904816zbMath0913.90141OpenAlexW2033144602MaRDI QIDQ4399052
Publication date: 17 May 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549508904816
Cites Work
- A new formulation of operation allocation problem in flexible manufacturing systems: mathematical modelling and computational experience
- Dimensions of manufacturing automation
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems
- Modelling and solving an FMS part selection problem
- Block Angular Structures and the Loading Problem in Flexible Manufacturing Systems
- A due date-based approach to part type selection in flexible manufacturing systems
This page was built for publication: A heuristic for setting up a flexible assembly system