Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
scientific article; zbMATH DE number 2013754 - MaRDI portal

scientific article; zbMATH DE number 2013754

From MaRDI portal
Publication:4437036

zbMath1059.90001MaRDI QIDQ4437036

Klaus Neumann, Christoph Schwindt, Jürgen Zimmermann

Publication date: 7 December 2003


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items (74)

A flow-based tabu search algorithm for the RCPSP with transfer timesResource levelling in project scheduling with generalized precedence relationships and variable execution intensitiesA genetic algorithm for the robust resource leveling problemScheduling the hospital-wide flow of elective patientsManaging and modelling general resource transfers in (multi-)project schedulingModels and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendarsMulti-mode resource-constrained project scheduling problems with non-preemptive activity splittingModelling and solving generalised operational surgery scheduling problemsOn the integration of diverging material flows into resource-constrained project schedulingAlgebraic solution of tropical optimization problems via matrix sparsification with application to schedulingA genetic algorithm for resource investment project scheduling problem, tardiness permitted with penaltyAn analysis of network and resource indicators for resource-constrained project scheduling problem instancesMixed-integer linear programming for resource leveling problemsThe total adjustment cost problem: applications, models, and solution algorithmsProduction scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithmAn iterative time‐bucket refinement algorithm for a high‐resolution resource‐constrained project scheduling problemNew concepts for activity float in resource-constrained project managementResource constraint scheduling with a fractional shared resourceResource leveling in projects with flexible structuresA constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraintsTabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertaintyDecentralised scheduling with confidentiality protectionA branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraintsUsing constraint programming for solving RCPSP/MAX-calAn empirical analysis of a set of hybrid heuristics for the solution of the resource leveling problemExact methods for the resource levelling problemSolving a real-life, large-scale energy management problemWeight-based heuristics for constraint satisfaction and combinatorial optimization problemsProduction scheduling with alternative process plansTime and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centresAn exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relationsDismantling of nuclear power plants at optimal NPVThe multi-mode resource investment problem: a benchmark library and a computational study of lower and upper boundsAn evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lagsA mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lagsImportant classes of reactions for the proactive and reactive resource-constrained project scheduling problemMultilevel capacitated lot-sizing and resource-constrained project scheduling: an integrating perspectiveTime symmetry of resource constrained project scheduling with general temporal constraints and take-give resourcesSkilled workforce scheduling in service centresScheduling tests in automotive R\&D projectsRecursive logic-based Benders' decomposition for multi-mode outpatient schedulingA multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problemMixed-integer linear programming and constraint programming formulations for solving resource availability cost problemsA hybrid differential evolution algorithm with column generation for resource constrained job schedulingPre-emption in resource-constrained project schedulingThe project scheduling problem with production and consumption of resources: a list-scheduling based algorithmNew competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processingRe-planning support system for make-to-order production with reserved resourcesScheduling of continuous and discontinuous material flows with intermediate storage restrictionsScheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithmA cyclic approach to large-scale short-term planning in chemical batch productionTheoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy modelsA survey of hybrid metaheuristics for the resource-constrained project scheduling problemA multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problemParallel machine scheduling with precedence constraints and setup timesA model, heuristic procedure and decision support system for solving the movie shoot scheduling problemSolving a tropical optimization problem with application to optimal schedulingDirect solution to constrained tropical optimization problems with application to project schedulingProject selection, scheduling and resource allocation with time dependent returnsLearning heuristics for basic block instruction schedulingA heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer timesScheduling projects with limited number of preemptionsAn efficient genetic algorithm for decentralized multi-project scheduling with resource transfersMaximizing the net present value of a project under uncertaintyThe resource-constrained activity insertion problem with minimum and maximum time lagsResource allocation by means of project networks: Dominance resultsResource allocation by means of project networks: Complexity resultsA priority-rule method for project scheduling with work-content constraintsConcentration inequalities for nonlinear matroid intersectionUnnamed ItemMinimizing total earliness and tardiness on re-entrant batch processing machine with time windowsA competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problemMinimizing the expected makespan of a project with stochastic activity durations under resource constraintsMinimizing maximum lateness in two-stage projects by tropical optimization




This page was built for publication: