scientific article; zbMATH DE number 2047436
From MaRDI portal
Publication:4451582
zbMath1042.90022MaRDI QIDQ4451582
A. A. Stolyar, Yury A. Kochetov
Publication date: 29 February 2004
Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Programming involving graphs or networks (90C35) Deterministic scheduling theory in operations research (90B35) Combinatorial optimization (90C27)
Related Items
Experimental investigation of heuristics for resource-constrained project scheduling: an update, A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling, Genetic algorithm for the resource-constrained project scheduling problem, A hybrid metaheuristic for the resource-constrained project scheduling problem, A hybrid genetic algorithm for the resource-constrained project scheduling problem, A random key based genetic algorithm for the resource constrained project scheduling problem, An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem, Some algorithms of solving minimax multiprocessor scheduling problem, Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems, A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem, A survey of hybrid metaheuristics for the resource-constrained project scheduling problem, A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem, Project selection, scheduling and resource allocation with time dependent returns, A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling, Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art
Uses Software