On the importance of sequencing decisions in production planning and scheduling
From MaRDI portal
Publication:4468896
DOI10.1111/1475-3995.00388zbMath1044.90034OpenAlexW1984398562MaRDI QIDQ4468896
Stéphane Dauzère-Pérès, Jean-Bernard Lasserre
Publication date: 11 June 2004
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/11250/163837
Related Items (9)
Simultaneous lotsizing and scheduling problems: a classification and review of models ⋮ A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem ⋮ Comparison of different approaches to multistage lot sizing with uncertain demand ⋮ Multi‐level, multi‐stage lot‐sizing and scheduling in the flexible flow shop with demand information updating ⋮ Just-in-Time Planning and Lot-Sizing ⋮ Parallel machine scheduling with time constraints on machine qualifications ⋮ Production planning with load dependent lead times: An update of research ⋮ Order release planning by iterative simulation and linear programming: theoretical foundation and analysis of its shortcomings ⋮ Single item lot sizing problems
This page was built for publication: On the importance of sequencing decisions in production planning and scheduling