Minimizing total flowtime and maximum job lateness in the twomachine flowshop system: a computerized algorithm
From MaRDI portal
Publication:4469135
DOI10.1080/02522667.2003.10699559zbMath1176.90259OpenAlexW1976390826MaRDI QIDQ4469135
Tapan Sen, Parthasarati Dileepan, Farhad M. E. Raiszadeh
Publication date: 14 June 2004
Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/02522667.2003.10699559
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Stochastic scheduling theory in operations research (90B36)
Cites Work
- Unnamed Item
- Optimal two- and three-stage production schedules with setup times included
- Minimizing Maximum Lateness in a Two-Machine Open Shop
- A dual algorithm for the one-machine scheduling problem
- Note—Sequencing n Jobs on m Machines to Minimise Maximum Tardiness: A Branch-and-Bound Solution
- Minimising the Maximum Penalty in the Two-Machine Flow Shop
- An algorithm to minimize total flowtime and maximum job lateness in the two-machine flowshop system
This page was built for publication: Minimizing total flowtime and maximum job lateness in the twomachine flowshop system: a computerized algorithm