Dynamic machining control and scheduling for multiple production projects in a deterministic period
From MaRDI portal
Publication:4469158
DOI10.1080/02522667.2003.10699578zbMath1180.90146OpenAlexW2014413808MaRDI QIDQ4469158
Publication date: 14 June 2004
Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/02522667.2003.10699578
Cites Work
This page was built for publication: Dynamic machining control and scheduling for multiple production projects in a deterministic period