Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Lower confidence bounds with sample size information for Cpm applied to production yield assurance - MaRDI portal

Lower confidence bounds with sample size information for Cpm applied to production yield assurance

From MaRDI portal
Publication:4474692

DOI10.1080/0020754031000138349zbMath1052.90542OpenAlexW2126004339MaRDI QIDQ4474692

Wen Lea Pearn, Ming-Hung Shu

Publication date: 12 July 2004

Published in: International Journal of Production Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/0020754031000138349




Related Items (19)

Procedure of the convolution method for estimating production yield with sample size informationSupplier selection for one-sided processes with unequal sample sizesEvaluating lifetime performance for the Pareto model with censored and imprecise informationAssessing process capability based on Bayesian approach with subsamplesSupplier Evaluation and Selection Based on Stochastic Dominance: A Quality-Based ApproachAn asymptotic confidence interval for the process capability index CpmOptimal tool replacement for processes with low fraction defectiveA Bayesian procedure for assessing process performance based on the third-generation capability indexFuzzy inference to assess manufacturing process capability with imprecise dataAn effective powerful test for one-sided supplier selection problemQuality-yield measure for production processes with very low fraction defectiveTesting process capability based onCpmin the presence of random measurement errorsGeneralized confidence intervals for the process capability index \(C_{pm}\)A powerful test for two-sided multiple independent characteristics supplier selection problemA flexible sampling scheme for variables inspection with loss considerationTool replacement for production with a low fraction of defectivesA comparison of methods forsing loss-based capability indexProcess performance evaluation based on Taguchi capability index with the consideration of measurement errorsDesign and Construction of a Variables Repetitive Group Sampling Plan for Unilateral Specification Limit



Cites Work


This page was built for publication: Lower confidence bounds with sample size information for Cpm applied to production yield assurance