Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Bottleneck-focused scheduling for a hybrid flowshop - MaRDI portal

Bottleneck-focused scheduling for a hybrid flowshop

From MaRDI portal
Publication:4474711

DOI10.1080/00207540310001602892zbMath1052.90559OpenAlexW2103460039MaRDI QIDQ4474711

No author found.

Publication date: 12 July 2004

Published in: International Journal of Production Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1080/00207540310001602892




Related Items (18)

Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup timesReview and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspectiveList scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibilityScheduling algorithms for a semiconductor probing facilityExtending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production schedulingNew heuristics for total tardiness minimization in a flexible flowshopA hybrid scheduling approach for a two-stage flexible flow shop with batch processing machinesMinimizing makespan in permutation flow shop scheduling problems using a hybrid metaheuristic algorithmA branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardinessThe hybrid flow shop scheduling problemWorkload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case studyA genetic algorithm for the hybrid flow shop scheduling with unrelated machines and machine eligibilityBottleneck-based heuristics to minimize tardy jobs in a flexible flow line with unrelated parallel machinesHeuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraintMinimizing total tardiness of orders with reentrant lots in a hybrid flowshopA bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machinesA TABU SEARCH ALGORITHM FOR A PIPE-PROCESSING FLOWSHOP SCHEDULING PROBLEM MINIMIZING TOTAL TARDINESS IN A SHIPYARDA filtered beam search method for the \(m\)-machine permutation flowshop scheduling problem minimizing the earliness and tardiness penalties and the waiting time of the jobs




Cites Work




This page was built for publication: Bottleneck-focused scheduling for a hybrid flowshop