Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
scientific article; zbMATH DE number 1488068 - MaRDI portal

scientific article; zbMATH DE number 1488068

From MaRDI portal
Publication:4495168

zbMath1074.90563MaRDI QIDQ4495168

Tonius Baar, Sigrid Knust, Peter Brucker

Publication date: 4 January 2001


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items (23)

An effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumerationComputing redundant resources for the resource constrained project scheduling problemMulti-objectives tabu search based algorithm for progressive resource allocationExperimental investigation of heuristics for resource-constrained project scheduling: an updateAn efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode caseNew concepts for activity float in resource-constrained project managementInsertion techniques for static and dynamic resource-constrained project scheduling.A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.Order-based neighborhoods for project scheduling with nonregular objective functions.A hybrid metaheuristic for the resource-constrained project scheduling problemA Multiobjective Resource-Constrained Project-Scheduling ProblemNew representation to reduce the search space for the resource-constrained project scheduling problemA random key based genetic algorithm for the resource constrained project scheduling problemTowards merging binary integer programming techniques with genetic algorithmsImproving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problemScheduling and constraint propagationA neurogenetic approach for the resource-constrained project scheduling problemA survey of hybrid metaheuristics for the resource-constrained project scheduling problemResource-constrained project scheduling: Notation, classification, models, and methodsActivity list representation for a generalization of the resource-constrained project scheduling problemA branch and bound algorithm for the resource-constrained project scheduling problemA linear programming and constraint propagation-based lower bound for the RCPSPExperimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem




This page was built for publication: