Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints
From MaRDI portal
Publication:4496902
DOI10.1080/002075400189653zbMath0945.90513OpenAlexW2147672179MaRDI QIDQ4496902
No author found.
Publication date: 21 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: http://hdl.handle.net/10419/147579
Related Items (6)
Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures ⋮ Modeling the planning and scheduling across the outsourcing supply chain: a Chaos-based fast Tabu–SA approach ⋮ A lexicographic approach to the robust resource-constrained project scheduling problem ⋮ Operator allocation planning for reconfigurable production line in one-of-a-kind production ⋮ Time-constrained project scheduling with adjacent resources ⋮ Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design
This page was built for publication: Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints