Job shop scheduling with a non-regular objective: A comparison of neighbourhood structures based on a sequencing/timing decomposition
From MaRDI portal
Publication:4497007
DOI10.1080/002075499190969zbMath0949.90530OpenAlexW2103575349MaRDI QIDQ4497007
Publication date: 21 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075499190969
Related Items (3)
Scheduling satellite launch missions: an MILP approach ⋮ The job shop scheduling problem with convex costs ⋮ Dynamic scheduling for complex engineer-to-order products
This page was built for publication: Job shop scheduling with a non-regular objective: A comparison of neighbourhood structures based on a sequencing/timing decomposition