Mixing macro and micro flowtime estimation model: Wafer fab example
From MaRDI portal
Publication:4497068
DOI10.1080/002075499190608zbMath0949.90562OpenAlexW2130280093MaRDI QIDQ4497068
Rong-Kwei Li, T.-F. Ho, T. Y. Tseng
Publication date: 21 August 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075499190608
Related Items (2)
Reducing simulation models for scheduling manufacturing facilities ⋮ Heuristic dispatching rule to maximize TDD and IDD performance
This page was built for publication: Mixing macro and micro flowtime estimation model: Wafer fab example