Push and pull strategies in multi‐stage assembly systems
From MaRDI portal
Publication:4521319
DOI10.1111/1467-9574.00135zbMath0985.90003OpenAlexW2125265600MaRDI QIDQ4521319
A. G. de Kok, Wang Wei, Nico P. Dellaert
Publication date: 5 July 2001
Published in: Statistica Neerlandica (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/1467-9574.00135
Related Items (3)
Vehicle routing problem with stochastic travel times including soft time windows and service costs ⋮ A capacitated lot sizing problem with stochastic setup times and overtime ⋮ Vehicle routing with soft time windows and stochastic travel times: a column generation and branch-and-price solution approach
This page was built for publication: Push and pull strategies in multi‐stage assembly systems