Bicriteria sequencing for just-in-time mixed-model assembly lines
From MaRDI portal
Publication:4525560
DOI10.1080/002075400422743zbMath1093.90529OpenAlexW2138001701MaRDI QIDQ4525560
Henry Aigbedo, Walid Zeramdini, Yasuhiro Monden
Publication date: 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075400422743
Related Items (9)
A scatter search based hyper-heuristic for sequencing a mixed-model assembly line ⋮ Algorithms for the car sequencing and the level scheduling problem ⋮ Human factor policy testing in the sequencing of manual mixed model assembly lines. ⋮ Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches ⋮ Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line ⋮ Sequence-to-customer goal with stochastic demands for a mixed-model assembly line ⋮ Mixed-model assembly line sequencing using beam search ⋮ Sequencing mixed-model assembly lines: survey, classification and model critique ⋮ Interactive bicriterion decision support for a large scale industrial scheduling system
This page was built for publication: Bicriteria sequencing for just-in-time mixed-model assembly lines