Forecasting policies for scheduling a stochastic due date job shop
From MaRDI portal
Publication:4525570
DOI10.1080/002075400422824zbMath1093.90533OpenAlexW2149944613MaRDI QIDQ4525570
Publication date: 12 June 2001
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075400422824
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Stochastic scheduling theory in operations research (90B36)
Related Items (7)
Executing production schedules in the face of uncertainties: a review and some future directions ⋮ Minimizing makespan for scheduling stochastic job shop with random breakdown ⋮ A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time ⋮ Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time ⋮ An artificial bee colony algorithm for the job shop scheduling problem with random processing times ⋮ Group shops scheduling with makespan criterion subject to random release dates and processing times ⋮ Optimal planning of a multi-station system with sojourn time constraints
This page was built for publication: Forecasting policies for scheduling a stochastic due date job shop