Single machine bicriteria scheduling with equal-length jobs to minimize total weighted completion time and maximum cost
From MaRDI portal
Publication:457296
DOI10.1007/s10288-013-0244-1zbMath1334.90051OpenAlexW1977916582MaRDI QIDQ457296
Cheng He, Xiumei Wang, Hao Lin
Publication date: 26 September 2014
Published in: 4OR (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10288-013-0244-1
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Related Items (3)
Pareto optimal algorithms for minimizing total (weighted) completion time and maximum cost on a single machine ⋮ Bi-criteria Pareto-scheduling on a single machine with due indices and precedence constraints ⋮ A note on competing-agent Pareto-scheduling
Cites Work
- Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time
- Multicriteria scheduling
- Multicriteria scheduling problems: a survey
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Single-Machine Scheduling to Minimize a Function of Two or Three Maximum Cost Criteria
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- Unnamed Item
This page was built for publication: Single machine bicriteria scheduling with equal-length jobs to minimize total weighted completion time and maximum cost