Reducing the number of paths in a minimized project-network with given bounds on the durations of activities
From MaRDI portal
Publication:4575164
DOI10.5277/ORD150405zbMath1391.90125OpenAlexW2336538354MaRDI QIDQ4575164
Publication date: 12 July 2018
Full work available at URL: http://yadda.icm.edu.pl/yadda/element/bwmeta1.element.desklight-17a8b857-3efc-44b9-8be7-76a8faf27997/c/05viattchenin.pdf
interval-valued datatypical pointdominant pathheuristic possibilistic clusteringproject-networkstationary clustering structure
Approximation methods and heuristics in mathematical programming (90C59) Deterministic network models in operations research (90B10)
This page was built for publication: Reducing the number of paths in a minimized project-network with given bounds on the durations of activities