Project scheduling and equipment planning with random breakdowns
DOI10.1051/ro/2017017zbMath1398.90058OpenAlexW2594445917MaRDI QIDQ4578170
Seyed Taghi Akhavan Niaki, Abbas Shafikhani, Amir Abbas Najafi
Publication date: 8 August 2018
Published in: RAIRO - Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1051/ro/2017017
project schedulingsimulationdesign of experimentssimulated annealinggenetic algorithmrandom breakdownequipment planning
Numerical mathematical programming methods (65K05) Mixed integer programming (90C11) Approximation methods and heuristics in mathematical programming (90C59) Stochastic scheduling theory in operations research (90B36)
Cites Work
- A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations
- Fuzzy goal programming - an additive model
- Project network models with discounted cash flows a guided tour through recent developments
- Activity nets: A guided tour through some recent developments
- Resource-constrained project scheduling: A survey of recent developments.
- Project scheduling. A research handbook.
- Integration of equipment planning and project scheduling
- An evaluation of the adequacy of project network generators with systematically sampled networks
- Rangen: A random network generator for activity-on-the-node networks
- Scheduling two-stage hybrid flow shop with availability constraints
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem
- A Horizon-Varying, Zero-One Approach to Project Scheduling
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Unnamed Item
- Unnamed Item
This page was built for publication: Project scheduling and equipment planning with random breakdowns